AutoBlinds.

08 / Roadmap

Quarter-long build plan.

Major class deliverables for final project. Status updated weekly as the quarter progresses.

Week 04
April 24

PCB Block Diagram

Mapped out the major sub-systems — MCU, motor driver, sensor input, and power — before laying down any traces.

Complete
Week 05
April 30

PCB Design — Final Submission

First-draft schematic, board layout, and 3D model finalized and submitted for fabrication.

Complete
Week 07
May 12

3D-Printed Enclosure

Housing for the stepper motor, PCB, and sensor module printed, fitted, and verified against existing blinds.

Complete
Week 09
May 28

Mobile App over Bluetooth

Companion app pairs with the ESP32 over BLE and reliably sends open / close / schedule commands.

Complete
Week 09
May 28

PCB Completion

Assembled board passes bring-up tests and successfully drives the stepper motor end-to-end.

Complete
Week 10
June 2

Final Poster & Presentation

Project poster delivered and live-presented to the class on Demo Day.

Complete
Week 10
June 2

Demo Video

Edited demo footage showing the system reacting to live light changes and app commands.

Complete
Week 10
June 2

Final Website

All sections completed with real photos, schematics, video, and resources for future ECE 196 students.

Complete
09 / Pivots

Notes & deviations.

Where the plan changed, and why.

Pivots logged: During the project, we had to adjust a few parts of our original plan. One pivot was that the CAD design did not fit all of the components as expected, so the housing needed changes. Another issue was that the sprocket did not fit the chain loop properly, which meant we had to rethink how the motor would grip and move the blinds. We also decided not to use a weather API for the automatic blinds feature and instead focused on simpler app-based control and scheduling.